Guest House Construction - Part II

Rain delayed the building of the foundation for weeks.

 

 I had to siphon out the excavation with a garden hose.

 

It only took one day to build the foundation.

 

 

The materials for the floor joists were delivered.

 

 

 

 They built a very solid floor system.

 

Then the OSB decking went on. 

 

After that, the wall materials arrived. They built a pile of wall junctions seen in the foreground.

 

Finally, we got walls.

 

 

 

We have lofts in each of the two bedrooms. 

 

The lofts add a few necessary square feet. When we rebuild the main house, we plan to live here during construction.

 