Rain delayed the building of the foundation for weeks.
I had to siphon out the excavation with a garden hose.
It only took one day to build the foundation.
The materials for the floor joists were delivered.
They built a very solid floor system.
Then the OSB decking went on.
After that, the wall materials arrived. They built a pile of wall junctions seen in the foreground.
Finally, we got walls.
We have lofts in each of the two bedrooms.
The lofts add a few necessary square feet. When we rebuild the main house, we plan to live here during construction.
Click above photo to continue with guest house construction.