Two panel doors are installed.
Then they started staining the cedar trim.
The solid bi-fold doors arrived.
The overflow was stored on the porch.
The bi-fold doors got stain.
And so did everything else...
It all came together when the trim went up.
The cedar paneling arrived.
The master bath is all cedar.
Then the lighting started to get installed. We were finally able to see.
We have a Tiffany up-light on our big Hunter fan in the main room.
We used very compact Minka-Aire fans in the bedrooms due to the proximity of the loft ladders.
The remote control for the fan with speed control including reverse and a lamp dimmer.
Then the cabinets got cedar panelling and trim.
The master bathroom is really turning out great.
There will be plain leaded or stained glass in the opening.
After staining, the peninsula and the master bath really looked great.